Work station for valves assembling/disassembling

Purpose

  • RMR-4, RMR-5 - disassembling and assembling of the wedge, stop, control, and shut-off valves. 
  • RMR-4-1 - disassembling and assembling and performing preliminary pneumatic tests of the wedge, stop, control, and shut-off valves at a pressure of up to 6 bar (87 psi). 
  • RMR-6 - disassembling and assembling of the wedge and parallel-seat gate valve. 
  • RMR-PPK - disassembling and assembling of the safety valves. 
  • RMR-SH - disassembling and assembling of the slab gate valves. 
  • RMR-AFK - disassembling and assembling of the wellhead valves (Cross-type Christmas Tree).


Model

Usable range DN, mm (″)

Weight, kg

RMR-4

15…300 (1/2...12)

502

RMR-4-1

50…350 (2...14)

1305

RMR-5

15…600 (1/2...24)

813

RMR-6

700...1200 (28…48)

3800

RMR-PPK

15…300 (1/2...12)

492

RMR-SH

65, 80 (2 1/2, 3)

1280

RMR-AFK

65 (2 1/2)

370


Advantages

  • RMR is a set of accessory equipment to ensure fast and efficient disassembly and assembly of the pipeline valves. 
  • The work bench with lockers, safety screen and lamp (1). 
  • The bench for disassembly and assembly of the pipeline valves DN 15...300 mm (1/2…12″) and safety valves (2). 
  • For convenience, the bench can be adjusted by height. 
  • The bench for disassembly and assembly of the pipeline valves with nominal bore DN 300...600 mm (12…24″) ( 3). 
  • For convenience, the bench is equipped with a ladder (4). 
  • The bench for preliminary pneumatic tests of the pipeline valves DN 50...300 (1/2…12″) mm (5). 
  • The stand with swinging boom, balance beam, replaceable screwdrivers and air preparation unit (6). 
  • The hydraulic press for pressing-in (pressing-out) of bush sleeves of the gate valves (7).
  • The device for compressing the disk springs of the gate valves (8). 
  • The drilling machine for repair jobs (9). 
  • The vice for disassembly and assembly of the pipeline valves with nominal bore DN 15...40 mm (1/2…1 ½″) (10). 
  • The stand with pneumatic screwdriver for installation and fixing of the Christmas Tree valves (11). 
  • The height-adjusted movable support (12). 
  • The hydraulic crane with load-carrying capacity 500 kg (1102 lbs) (13). 
  • Each work station delivery set includes a fitting tool kit (14), rechargeable flashlight (15), and the first aid kit (15). 
  • The stand for safety valves disassembly/assembly (16). 
  • The bench for disassembly and assembly of the pipeline valves DN 700...1200 mm (28…48″) (17). For convenience, the bench is equipped with a repair site (18).

Video

COMPLETE SET

RMR-4

RMR-4-1

RMR-5

RMR-6

RMR-PPK

RMR-SH

RMR-AFK

Work bench with lockers and safety screen (1)

+

+

+

+

+

+

 

Bench (2)

+

+

+

 

 

+

 

Bench (3)

 

 

+

 

 

 

 

Ladder (4)

 

 

+

 

 

 

 

Bench for preliminary pneumatic tests up to 6 bar (90 psi) (5)

 

+

 

 

 

 

 

Stand with swinging zigzag boom and pneumatic screwdriver (6)

+

+

+

 

+

+

 

Hydraulic press (7)

 

 

 

 

 

+

 

Device for compressing the disk springs of the gate valves (8).

 

 

 

 

 

+

 

Bench drilling machine (9)

+

+

+

+

+

+

 

Vice (10)

+

+

+

+

+

+

 

Stand (11)

 

 

 

 

 

 

+

Movable support (12)

 

 

 

 

 

 

+

Hydraulic crane (13)

 

 

 

 

 

 

+

Fitting tool kit (14)

+

+

+

+

+

+

+

Rechargeable flashlight (15)

+

+

+

+

+

+

 

First aid kit (15)

+

+

+

+

+

+

+

Stand for safety valves disassembly/assembly (16)

 

 

 

 

+

 

 

Bench for disassembly/assembly of the wedge and parallel-seat gate valve (17)

 

 

 

+

 

 

 

Repair site (18)

 

 

 

+